Call 811, or use your state’s 811 website, at least two business days before you put a shovel, auger or machine in the ground. The request is free, and utility owners send locators to mark their buried lines with paint or flags. In Idaho and Utah, where we operate, the notice period is two business days. Other states range from two to three.

This guide covers who to call, how to place the request, what the colors mean, what 811 does not cover, and how to plan a fence, deck or pool so the locate request goes smoothly.

Propertyimprovementestimator
Map Your Yard Project First
Draw fences, decks, or pools on a virtual property map to define project dimensions before requesting tailored contractor quotes.
Plan your outdoor project

TL;DR

  • 811 is free to homeowners and contractors. Utility companies fund it.
  • Request the locate at least two business days ahead in Idaho and Utah. Other states vary.
  • Marks show approximate locations of public utilities only. Lines past the meter are your responsibility.
  • Your contractor needs their own ticket. A homeowner’s or general contractor’s ticket does not cover anyone else.
  • Map and measure the dig area first, so your white-paint outline and your quote request describe the same ground.

Table of Contents

What 811 is and why it is free

811 is the national call-before-you-dig number. It routes you to the one-call center for your state, which sends your request to every member utility with lines near your site. Anyone who plans to dig should call 811 or use their state center’s website before starting.

The service costs you nothing because utility companies pay for membership in their state’s one-call center, so they get alerted when someone digs near their lines. If anyone asks you to pay for a standard locate request, stop and check before you hand over money.

The stakes are real. The same source reports that an underground line is damaged roughly every six minutes in the U.S., and it cites federal data saying that calling 811 gives a 99% chance of avoiding damage, injury or death. Treat those as national figures, not predictions for your yard.

Who to call in Idaho and Utah

The number is always 811, but each state has its own center and its own rules.

State One-call center Notice required
Idaho (including Boise County) Dig Line, Inc., 811 or 800-342-1585, based in Boise 2 business days
Utah (including St. George) Blue Stakes of Utah 811 2 business days

North Idaho is split among separate centers. Bonner, Boundary and Kootenai counties go through Dig Safe North Idaho 811, for example. Dialing 811 connects you to the right one, so you don’t need to memorize the numbers.

In Idaho, Idaho Power’s safety sheet says facility owners have two full business days after your call to mark their lines. It also says excavation cannot begin until all known facilities are marked.

How to place a locate request, step by step

  1. Decide exactly where you will dig. Fence line, deck footings, pool footprint, trench for lighting: write down the full area, not just the first spot.
  2. Outline the area in white. Use white paint or flags, as Blue Stakes advises. Utilities locate only inside the area you specify.
  3. Call 811 or file online. Give the address, the nearest cross street, the type of work and the marked area. Do it at least two business days ahead, not counting weekends or holidays.
  4. Wait for every utility to respond. Compare the list of companies on your ticket with the marks you see. A missing response means a missing mark.
  5. Read the marks. Our guide to the 811 marking colors explains what each color stands for.
  6. Dig with care near the marks. Use hand tools in the tolerance zone. Idaho Power’s sheet says to hand dig within 24 inches of either side of marked lines. Tolerance zones differ by state, so confirm yours with your one-call center.
  7. Keep the ticket alive. In Idaho, locate tickets are valid for 28 days. If work hasn’t started by then, or the marks get washed out, call again.

What 811 does not do

It gives approximate locations, not guarantees

The process is a legal communication bridge between you and the utilities. It marks the approximate location of public lines, and safety professionals expect you to dig by hand near the flags no matter what. Soil moves, roots grow and past repairs aren’t always on record.

It does not mark your private lines

Public locators typically stop at the meter or service connection. Private lines are the owner’s responsibility. Think of the line to a detached garage, a pool equipment pad, a shed with power, a sprinkler system or a gas line to a fire pit. For those you usually need a private utility locator.

Public utilities stop at meter; private lines continue

Private lines are the usual surprise on pool and outbuilding projects. If a line runs from your house to a workshop, ask the person who installed it for a drawing, and hire a private locator before the excavator arrives.

It does not cover your contractor

If you hire help, you need your own ticket, because no blanket ticket exists for a general contractor. Each person or company doing the digging needs a valid ticket for that site. Ask your contractor for the ticket number and the date it was issued before work starts. That is a normal question and a good contractor expects it.

It does not make an old locate valid

Even if your yard was marked last year, a new project needs a fresh ticket. Erosion, roots and utility maintenance move things, and an old mark doesn’t protect an excavator who lacks a current ticket for the current work.

Do I need to call for small jobs?

Usually yes. Tilling a garden, setting a mailbox post, planting a tree or sinking fence posts all count as digging. Some utilities sit shallow: internet and cable lines can be buried only a few inches down, so even a small shrub can cut service or injure you.

Some states do exempt shallow hand digging. Texas, for example, exempts minor digging at 16 inches or less, but exemptions differ widely and may not apply in Idaho or Utah. The safe habit: make the free request, and don’t rely on an exemption you haven’t confirmed with your state’s one-call center.

Plan the dig before you call

The locate request works best when the area is defined. A vague request leads to missed marks, extra tickets and delays. A few project types need particular attention.

Fences. Posts go in every few feet along the whole line, so the whole line needs marking. Know where your boundary is first: our guide on finding property lines before you build, fence or dig shows how. Utility easements often run along lot lines, right where fences go.

Decks. Footings are small, but utilities often run beside the house. See preparing your yard for a new deck for what to clear and check before footing day.

Pools. Excavation is deep and wide, and equipment lines, gas heaters and electrical runs add private utilities to the picture. Plan for a private locator as well as 811.

Retaining walls. The trench for the base is long and deep. Our piece on retaining wall footing depth covers what the excavation involves.

Driveways and pads. Grading and base prep can reach buried lines. If you’re paving, the asphalt permit cost calculator points out the drainage and right-of-way reviews that come with it.

Land clearing. Clearing brush and stumps before building is its own kind of ground disturbance. This guide to preparing land for construction is a good companion for that step, though local rules differ from state to state.

If you also want to understand the plumbing side of your yard, a guide to finding your sewer cleanout helps you locate a key private line without digging. That’s useful when drawing a project area that must stay clear of it.

Our view: measure first, then call

We built Property Improvement Estimator around one idea: a project should be drawn before it is priced or dug. When homeowners outline a fence, deck or pool on a satellite map, they see how much ground the work actually touches. That includes the corners and gate swings, the equipment path and the stockpile area that never make it into a rough sketch.

That same outline helps with 811. You know the footprint, so the white-paint outline matches the plan. You can hand the same drawing and measurements to a contractor, so everyone is talking about the same ground. Most dig-day surprises we hear about come from a scope that was never defined.

One limit we state plainly: our map shows your project, not what is underground. Only the utility locators and, for private lines, a private locator can do that. Use our tools to define the work, and use 811 to find out what’s beneath it.

— Christian

From a drawn plan to contractor quotes

Once your area is mapped and your ticket is in, the next question is cost. With the Fence Estimator, Deck Estimator, Pool Estimator or Concrete Estimator, you draw the project on a property map and get a local, site-specific planning range. No account is needed. When you’re ready, you can send the drawing and measurements to contractors as a quote request. Our local project report pulls the details together in one place.

From a drawn plan to contractor quotes — overview diagram

A tip for quote conversations: tell each bidder who is pulling the 811 ticket, and when. It should be settled in writing before the work is scheduled.

Common mistakes to avoid

  • Assuming the contractor handles everything. Ask for their ticket number, and check that it matches your site and scope.
  • Marking only the first spot. If the fence turns a corner or the trench extends, mark the full path.
  • Waiting too long. Tickets expire. In Idaho the window is 28 days, per Idaho Power.
  • Ignoring the private side of the meter. Sprinkler lines, outbuilding power and gas to a fire pit are on you.
  • Treating paint as proof. Marks are approximate. Hand dig near them, and stop and call 811 if you find something unmarked.
  • Burying or patching a damaged line. If you hit a line, stop work and call 811. If gas is involved or someone is at risk, leave the area and call 911, as PHMSA’s guidance on digging safely stresses for emergencies.

FAQ

How much does 811 charge?

Nothing. The request and the marking of public lines are free to homeowners and contractors, because utility companies fund the service. A private locator for lines past the meter is a separate business, and that one does charge.

What happens if you dig before calling 811?

You risk hitting a buried line, which can cause outages, property damage or serious injury. You may also be liable for repair costs, and in many states the law requires notice before digging. Check the penalties with your state’s one-call center or utility regulator, since they vary.

Can I till my yard without calling 811?

Assume you can’t. Tilling and any other earth moving count as excavation in many places, and some lines sit just a few inches deep. A few states exempt shallow hand work, but you should confirm that with Dig Line in Idaho or Blue Stakes in Utah before relying on it.

Do I have to call again if my area was marked before?

Yes, for each new project. Conditions change, and an earlier ticket doesn’t cover new work. In Idaho, tickets are also valid for only 28 days.

Sources

  • 8-1-1, Wikipedia
  • 811 Before You Dig: national overview
  • Idaho, 811 Before You Dig
  • Idaho Power: Call Before You Dig (PDF)
  • Blue Stakes of Utah 811: 5 reasons to call before you dig (KSL)
  • PHMSA: Call Before You Dig
  • Texas811 Excavator Guide (PDF)
  • Texas811 Homeowner FAQs
Ready to price the project on your property?

Use the article as context, then draw the actual layout on the map.

Open the estimator